We are now up and running with three identically operating Locus Units. Spent the afternoon establishing 2 control points on the beginning end of a 2 mile sanitary sewer line. Ran these two in, with some redundancy, repeat vectors, in short sessions. Short compared to what we had been experiencing. Ran all sessions on the new points for "10k" times (we had been running everything to 20k). Amazing, everything passed - chi square, tau, QA, repeat vectors. And all under less than desireable sv configuration.
I hope we're finally off to the races now.
Thanks Bill Martin, Mike Margolis, and everyone else I've been a pain in the wazoo to for the last couple of months.
J.D. Billings, RPLS TX
You are very welcome J.D. I am happy to hear you are up and running again.
Bill Martin
Ashtech Precision Products